The Downtown Line (DTL) will be built in three stages, with Stage 1 to be completed in 2013, Stage 2 to be completed in 2015 and Stage 3 in 2016. When fully completed, the DTL will enhance the connectivity of the Rapid Transit System network and facilitates direct travel from the northwestern and eastern areas of the island to the Central Business District and the Marina Bay.

Contents

Stage 1

The 4.3km Line comprises 6 stations. These stations are: Chinatown, Telok Ayer, Downtown, Bayfront, Promenade and Bugis. Stage 1 of the Line has commenced its construction in 2009 and will be completed in 2013 and will provide a strategic transport link to serve workers, residents and visitors in the exciting Marina Bay area and upcoming developments such as the Marina Bay Sands Integrated Resorts and the Marina Bay Financial Centre.

  • Chinatown Interchange Station
    牛车水转换站
  • Telok Ayer Station
    直落亚逸站
  • Downtown Station
    市中心站
  • Bayfront Interchange Station
    海湾转换站
  • Promenade Interchange Station
    海滨转换站
  • Bugis Interchange Station
    武吉士转换站

Stage 2

The 16.6km long Downtown Line Stage 2 (DTL2) comprises one depot and 12 stations, including three interchange stations at Little India, Newton and the Botanic Gardens. These 3 interchange stations will link to the North East Line(NEL), North South Line(NSL) and Circle Line(CCL) respectively, giving commuters greater accessibility to the rest of the island and significantly improving travel time.

  • Rochor Interchange Station
    梧槽转换站
  • Little India Station (Interchange for DTL2 and NEL)
    小印度转换站 (滨海市区线第2阶段和东北线转换站)
  • Newton Station (Interchange for DTL2 and NSL)
    纽顿转换站 (滨海市区线第2阶段和东北线转换站)
  • Stevens Station
    史蒂芬站
  • Botanic Gardens (Interchange for DTL2 and CCL)
    植物园转换站 (滨海市区线第2阶段和东北线转换站)
  • Tan Kah Kee Station
    陈嘉庚站
  • Sixth Avenue Station
    第六道站
  • King Albert Park Station
    阿尔柏王园站
  • Beauty World Station
    美世界站
  • Hillview Station
    山景站
  • Cashew Station
    凯秀站
  • Bukit Panjang Station
    武吉班让站

Stage 3

The 19.1km Line will feature 15 stations. It will run through MacPherson, Bedok Reservoir and Tampines ending at the East West Line Expo Station. Scheduled to be completed in 2016, it will reduce travel time by 10 minutes for commuters traveling to the city from Bedok Reservoir and Tampines.

Stage 3 of the Downtown Line is still in the planning stages and detailed information on DTL 3 will be released at a later date. However, it was announced by the LTA that the confirmed interchange stations are:

  • Rochor Interchange Station
    梧槽转换站
  • MacPherson Interchange Station
    麦波申转换站
  • Tampines Interchange Station
    淡滨尼转换站
  • Expo Interchange Station
    博览转换站

Stations

This page is still under construction.

Alpha-Numeric
Code
Abbreviation Station Name Notes
English Chinese Tamil
Downtown Line
DT1 / BP6 Unknown Bukit Panjang 武吉班让 புக்கிட் பாஞ்சாங் U/C, Terminus (11), Future Interchange station with BPLRT
DT2 Unknown Cashew 凯秀 U/C
DT3 Unknown Hillview 山景 U/C
DT5 Unknown Beauty World 美世界 U/C
DT6 Unknown King Albert Park 阿尔伯王园 U/C
DT7 Unknown Sixth Avenue 第六道 U/C
DT8 Unknown Tan Kah Kee 陈嘉庚 U/C
DT9 / CC19 Unknown Botanic Gardens 植物园 U/C, Future Interchange station with CCL
DT10 Unknown Stevens 史蒂芬 U/C
DT11 / NS21 NEW Newton 纽顿 நியூட்டன் U/C, Future Interchange station with NSL
DT12 / NE7 LTI Little India 小印度 லிட்டில் இந்தியா U/C, Future Interchange station with NEL
DT13 / DT?? Unknown Rochor 梧槽 U/C,Future interchange with Downtown Line Stage 3
DT14 / EW12 BGS Bugis 武吉士 பூகிஸ் U/C, Terminus (11) until completetion of DTL2, Future Interchange station with EWL
DT15 / CC4 Unknown Promenade 宝门廊 U/C, Future Interchange station with CCL
DT16 Unknown Bayfront 海湾 U/C
DT17 Unknown Downtown 市中心 U/C
DT18 Unknown Telok Ayer 直落亚逸 U/C
DT19 / NE4 CNT Chinatown 牛车水 சைனாடவுன் U/C, Terminus (12), Future Interchange station with NEL
 ??  ??  ??
(Details to be annonunced later)
 ??
(稍后才有相关资讯)
 ?? Stage 3 details are under planning
DT?? / DT13 Unknown Rochor 梧槽 U/C, Interchange with Downtown Line Stage 2
DT?? - DT??  ??  ??
(Details to be annonunced later)
 ??
(稍后才有相关资讯)
 ?? Stage 3 details are under planning
DT?? / CC10 Unknown MacPherson 麦波申 U/C',Future Interchange station with CCL
DT?? - DT??  ??  ??
(Details to be annonunced later)
 ??
(稍后才有相关资讯)
 ?? Stage 3 details are under planning
DT?? / EW2 TAM Tampines 淡滨尼 தெம்பினிஸ் U/C,Future Interchange station with EWL
DT?? - DT??  ??  ??
(Details to be annonunced later)
 ??
(稍后才有相关资讯)
 ?? Stage 3 details are under planning
DT?? / CG1 XPO Expo 博览 எக்ஸ்போ U/C,Terminus (12),Future Interchange station with CGL

Note :

  • Construction for the Downtown Line (DTL) has just begun. Its schematic profile, station names as well as alpha-numeric and end-destination codes are subject to confirmation.

Newsletters

Rail Lines in Singapore

MRT Lines

 NS  North South Line
 EW  East West Line
 CG  Changi Airport Extension
 NE  North East Line
 CC  Circle Line (Opened/Opening/Under Construction)
 --  Marina Bay Extension (Under Construction)
 DT  Downtown Line (Under construction/Planning)
 --  Thomson Line (Planning)
 --  Eastern Region Line (Planning)

LRT Lines

 BP  Bukit Panjang LRT
 SE   SW   STC  Sengkang LRT
 PE   PW   PTC  Punggol LRT

Reference

Personal tools