Marina Bay MRT Station
From SgWiki
| NS27 CE2 Marina Bay 滨海湾 மரீனா பே | ||||||||||||||||
| Marina Bay MRT station platform. | ||||||||||||||||
| Station statistics | ||||||||||||||||
| Address | 21 Marina Station Road Singapore 018990 | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Coordinates | 1°16′33.95″N, 103°51′16.83″E | |||||||||||||||
| Lines | North South, Circle(U/C) | |||||||||||||||
| Connections | Bus, Taxi | |||||||||||||||
| Structure | Underground | |||||||||||||||
| Levels | 3 (1 U/C) | |||||||||||||||
| Platforms | Island | |||||||||||||||
| Tracks | 4 (2 U/C) | |||||||||||||||
| Other information | ||||||||||||||||
| Opened | 4 November 1989 (North South Line) | |||||||||||||||
| Code | NS27 | |||||||||||||||
| ||||||||||||||||
| Location | ||||||||||||||||
| Maps | ||||||||||||||||
| Please insert Maps not Picture | ||||||||||||||||
The Marina Bay MRT Station (NS27) is the southern terminal station of the North South Line in Singapore. This station is located on reclaimed land and there are no developments surrounding it, and hence contrary to what the name implies, there exists a slight distance between the station and the actual town of Marina Bay. The station is used now as a means for locals to travel from other parts of the island here to connect to a bus service that brings them to a recreational area nearby. In the future, this station will serve businessmen & office workers who work in the up and coming New Downtown, an extension of Singapore's Central Business District. This Station will also serve residents who live in the New Downtown, as well as tourists and locals visiting the attractions that are located there.
This station was one of 4 stations which participated in Exercise Northstar V, a mock terrorist exercise held on Jan 8 2006.
This station would be an interchange with the Circle Line in the future, which is part of the rumoured Stage 6 of the Circle Line from Promenade to HarbourFront. It may be thought that the extension will go down via Keppel Road, stopping at Shenton Way after Marina Bay and terminating at Harbour Front.
With the Circle Line extension to Marina Bay, the North-South Line will have 3 interchanges with the Circle Line (Marina Bay, Dhoby Ghaut, Bishan) like the North East Line (HarbourFront, Dhoby Ghaut, Serangoon). Only the East West Line will have 2 interchanges with the Circle Line (Paya Lebar, Buona Vista).
In the future, the North South Line will be extended to Marina South Pier with a new 1-km extension. An extension to Marina Barrage was previously planned but plans for that were shelved.
When completed in 2014, commuters will be able to get to Marina South Pier, the upcoming new cruise terminal and the Gardens by the Bay via MRT.
The Land Transport Authority awarded the $357.5 million contract to Samsung C&T Corporation for the design and construction of the extension's additional station and its associated tunnels.
Contents |
Layout
| L1 | Street Level | |
| B1 | NSL Concourse | Faregates, Ticketing Machines, Station Control |
| B2 Platforms | Platform A | North South Line towards NS1 EW24 Jurong East via NS9 Woodlands (→) |
| Platform B | North South Line towards NS1 EW24 Jurong East via NS9 Woodlands (→) | |
Shops and facilities
NIL
Nearby landmarks
Nil
Exits
- A: Marina St
- B: Closed till further notice
Train Service
| Destination | First Train | Last Train | ||||
|---|---|---|---|---|---|---|
| Mon - Sat | Sunday & Public Holiday | Daily | ||||
| North South Line | ||||||
| to NS1 Jurong East | 6.01am | 6.26am | 11.46pm | |||
| to NS7 Kranji | - | - | 12.06am | |||
Transfer to Buses
Links to Marina City Park, Marina Mall (closed down in January 2008) and the Marina South Pier are available at the bus stops outside the station, along Marina Street through these services:
| Bus Stop Code: 03311 (Marina Bay Station) | |||
|---|---|---|---|
| Service | Between | And | Notes |
| SBS Transit Trunk Services | |||
| 400 | Shenton Way Bus Terminal | Marina Grove (loop) | |
| 402 | Marina South Pier | Anson Road (loop) | |
| Bus Stop Code: 03319 (Opp Marina Bay Station) | |||
|---|---|---|---|
| Service | Between | And | Notes |
| SBS Transit Trunk Services | |||
| 400 | Shenton Way Bus Terminal | Marina Grove (loop) | |
| 402 | Marina South Pier | Anson Road (loop) | |
Incidents
Train Disruption
On May 28, 2009, the launch day of the Circle Line, Southbound trains from Dhoby Ghaut were disrupted from 1.20 pm to 1.40 pm during the Lunchtime Xpress when a train broke down and was towed back to this station by another train. 3700 passengers were affected.
Category Links
| Railway Lines in Singapore | |
|---|---|
| Mass Rapid Transit (MRT) | North South Line • East West Line • Changi Airport Extension • North East Line • Circle Line • Marina Bay Extension • Downtown Line • Thomson Line • Eastern Region Line |
| Light Rapid Transit (LRT) | Bukit Panjang LRT • Sengkang LRT • Punggol LRT |
| International | Intercity North-South (KTM) |
| Other lines | Changi Airport Skytrain (CAAS) • Jurong Bird Park Panorail (WRS) • Sentosa Express (SDC) • Sentosa Monorail (defunct) (SDC) |
| Mass Rapid Transit (Singapore) | ||
|---|---|---|
| Lines and stations | Current | North South Line • East West Line • Changi Airport Extension • North East Line • Circle Line |
| Under Construction | Circle Line • Marina Bay Extension • Downtown Line • Thomson Line • Eastern Region Line | |
| Future | Thomson Line • Eastern Region Line | |
| Defunct | Branch Line | |
| Rolling stock | Kawasaki Heavy Industries C151 • Siemens C651 • Kawasaki Heavy Industries & Nippon Sharyo C751B • Alstom Metropolis C751A • Alstom Metropolis C830 • Kawasaki Heavy Industries C151A • Bombardier MOVIA C951 | |
| Depots | Bishan • Changi • Gali Batu • Kim Chuan • Sengkang • Ulu Pandan | |

