North South Line

From SgWiki

(Redirected from North South MRT Line)
Jump to: navigation, search
The North South Line is coloured red on system maps.
The North South Line is coloured red on system maps.

The North South Line was the first Mass Rapid Transit (MRT) line in Singapore. The line is currently 44 km long with 25 stations, and is operated by SMRT Corporation. Traveling from one end of this line to the other end takes about one hour, and this line is coloured red on the rail map.
As the name implies, the line connects central Singapore to both northern and southern parts of the island. Cross-platform transfer to the East West Line is provided at Jurong East, City Hall and Raffles Place stations while transfer to the North East Line is possible via a linkway at Dhoby Ghaut station. When the Woodlands Extension was opened in 1996, the Branch MRT Line consisting of the route from Jurong East MRT Station to Choa Chu Kang MRT Station was integrated into the main line.

Contents

History

Initial System

  • 7 November 1987: Yio Chu Kang - Toa Payoh (First section opened)
  • 12 December 1987: Toa Payoh - Outram Park (now a station in East West Line)
  • 20 December 1988: Yio Chu Kang - Yishun
  • 4 November 1989: City Hall - Marina Bay (start of separate North South Line & East West Line)
  • 10 March 1990: Jurong East - Choa Chu Kang (initially operated as the Choa Chu Kang branch of the East West Line)

2nd phase of development

  • 10 February 1996: Yishun - Choa Chu Kang (the Choa Chu Kang branch of the East West Line became part of the present North South Line)

North South Line extension

A 1 km one station extension to the North South Line will be constructed and completed by 2014. The new station will be located near the upcoming International Cruise Terminal at Marina Bay. Minister Raymond Lim announced on 12 February 2009 that the completion date for the extension will be brought forward by a year to 2014.

Jurong East Modification Project

The Jurong East Modification Project (JEMP) consists of the construction of a new platform and the addition of a fourth track to Jurong East Station by 2012. The North South Line currently utilises one track at Jurong East for layover hence a second track will increase the frequency of the North South Line. Once completed, it is expected to reduce waiting time for commuters from 4.5 minutes to 2.5 minutes. On 12 February 2009, Minister Raymond Lim announced that the JEMP will be completed by 2011, one year ahead of schedule.

Possible future stations

At least 2 more stations may be added to the line in the future since alphanumeric codes NS6 & NS12 have been reserved for future use.

  • 1 new station between Yew Tee MRT Station & Kranji MRT Station
  • 1 new station between Sembawang MRT Station & Yishun MRT Station

Station

Alpha-Numeric
Code
Abbreviation Station Name Notes
English Chinese Tamil
North South Line
NS1 / EW24 JUR Jurong East 裕廊东 ஜூரோங் கிழக்கு Terminus (4), Interchange station with EWL
NS2 BBT Bukit Batok 武吉巴督 புக்கிட் பாத்தோ
NS3 BGB Bukit Gombak 武吉甘柏 புக்கிட் கொம்பாக்
NS4 / BP1 CCK Choa Chu Kang 蔡厝港 சுவா சூ காங் Interchange station with BPLRT
NS5 YWT Yew Tee 油池 இயூ ட
NS7 KRJ Kranji 克兰芝 கிராஞ்சி
NS8 MSL Marsiling 马西岭 மார்சிலிங்
NS9 WDL Woodlands 兀兰 உட்லண்ட்ஸ்
NS10 ADM Admiralty 海军部 அட்மிரல்டி
NS11 SBW Sembawang 三巴旺 செம்பாவாங்
NS13 YIS Yishun 义顺 யீஷூன்
NS14 KTB Khatib 卡迪 காதிப்
NS15 YCK Yio Chu Kang 杨厝港 இயோ சூ காங்
NS16 AMK Ang Mo Kio 宏茂桥 அங் மோ கியோ
NS17 / CC15 BSH Bishan 碧山 பீஷான் Interchange station with CCL
NS18 BDL Braddell 布莱德 பிரேடல
NS19 TAP Toa Payoh 大巴窑 தோ பயோ Commonly known as "TPY"
NS20 NOV Novena 诺维娜 நொவீனா
NS21 / DT11 NEW Newton 纽顿 நியூட்டன் Future Interchange station with DTL
NS22 ORC Orchard 乌节 ஆர்ச்சர்ட்
NS23 SOM Somerset 索美塞 சாமர்செட்
NS24 / NE6 / CC1 DBG Dhoby Ghaut 多美歌 டோபி காட் Interchange station with NEL, Future interchange station with CCL
NS25 / EW13 CTH City Hall 政府大厦 நகர மண்டபம் Interchange station with EWL
NS26 / EW14 RFP Raffles Place 莱佛士坊 ராஃபிள்ஸ் பிளேஸ் Interchange station with EWL
NS27 MRB Marina Bay 滨海湾 மரீனா பே Terminus (5)


Rolling stock

Three batches of rolling stock are in service on the line, i.e. the Kawasaki Heavy Industries C151, the Siemens C651 and the Kawasaki Heavy Industries & Nippon Sharyo C751B. These trains operate from the Bishan depot between Ang Mo Kio station and Bishan Station on the North South Line. The Bishan Depot has maintenance and train overhaul facilities for trains along the North South Line.

Further information

  • During morning peak, there are limited direct cross-over trains to the East West Line, where trains depart from Bishan depot first and start from Ang Mo Kio to travel towards Pasir Ris via Jurong East. There are also additional services from Marina Bay to Yishun.
  • During evening peak, there are additional services from Jurong East to Yew Tee, and from Marina Bay to Yishun.
  • Additional special event services operate between Marina Bay and Yishun, and between Marina Bay and Ang Mo Kio.
  • A Lunchtime Xpress services operates between Ang Mo Kio and Marina Bay on weekdays between 12pm - 2pm.

Rail Lines in Singapore

MRT Lines

 NS  North South Line
 EW  East West Line
 CG  Changi Airport Extension
 NE  North East Line
 CC  Circle Line (Opened/Opening/Under Construction)
 --  Marina Bay Extension (Under Construction)
 DT  Downtown Line (Under construction/Planning)
 --  Thomson Line (Planning)
 --  Eastern Region Line (Planning)

LRT Lines

 BP  Bukit Panjang LRT
 SE   SW   STC  Sengkang LRT
 PE   PW   PTC  Punggol LRT

Personal tools